Questions 131-134 refer to the following e-mail.
| From: | Facilities Department |
| To: | All Staff |
| Subject: | AC issues |
| Date: | 4 February |
Please be advised that an equipment contractor, Torrono Sheet Metal, is scheduled to start work on the chiller enclosure at the rear of the building tomorrow morning. The contractor will be installing a steel cover to ______[131] protect the inner workings of our heating and cooling equipment.
Expect to see technicians entering and leaving the building repeatedly, carting large machine parts and tools. There will be some noise associated with this project, and we ask for your patience.
______[132], you should probably look for on-street parking. The contractor's vans ______[133] much of the driveway. ______[134].
Jorge Carreras, Facilities Director